
Curved gray paver driveway
The short answer
In the Village of Palmetto Bay, a driveway is permitted by the village's own Building and Permitting Department at 9705 East Hibiscus Street, and the contractor has to be registered with the village before any permit can be issued. Single-family standards allow up to three driveway approaches on one street frontage, with 32 feet of total approach width, 24 feet as the maximum for any single driveway and 10 feet as the minimum, set back at least 3 feet from the neighbor's property line. If the layout drops the pervious swale area below 58 percent, the village can require new stormwater drainage or a study signed by a licensed engineer.
Palmetto Bay
Palmetto Bay has run its own building department since the village incorporated in 2002. The Building and Permitting Department is at 9705 East Hibiscus Street, open Monday to Friday from 7:30 a.m. to 4:00 p.m. and closed for lunch between noon and 1:00 p.m. The village points to Section 105.1 of the Florida Building Code as the rule that makes the permit necessary before work begins.
Every contractor must register with the Village of Palmetto Bay before applying for a permit, and the village states that permits cannot be issued until the contractor's information is current and verified. This is a village registration on top of the state license, and it is the contractor's job, not the homeowner's.
Walkthrough Wednesday, the village's same-day permitting service, started on May 27, 2026 and runs the last Wednesday of each month between 7:30 and 9:00 a.m. at Village Hall. Driveways are one of the eligible permit types and the village publishes a driveway permit package to bring already filled in. Every required document has to be in hand that morning, and the contractor registration has to be up to date, or the permit does not get issued that day.
A village ordinance passed in 2025 reduced building permit fees by 15 percent on certain home improvement projects for homesteaded properties, and driveways are named on that list along with pools, spas, pool decks, fences, stand-by generators and window and door replacement. The village asks you to call the Building and Permitting Department at 305-259-1250 for the fee on your particular project.
Since March 31, 2025, Miami-Dade County requires approval for new or expanded paving (what the code calls non-structural impervious surface improvements) on single-family and duplex properties, in both unincorporated areas and cities; a city may run its own program if it is at least as strict as the county's. Ask the permit office whether your project triggers this drainage review.
Where we work
We build driveways across Palmetto Bay (ZIP 33158), from around Historic Old Cutler Road, which the village marks in three separate segments on its historical sites tour, The Charles Deering Estate at Cutler, on Old Cutler Road (Richmond Cottage from 1896, Stone House from 1922), The Chinese Bridge, built in 1916 on what is now SW 72nd Avenue, US 1, South Dixie Highway, the village's western border and Village Hall, 9705 East Hibiscus Street. Palmetto Bay is about 10.3 miles from our office at 777 NW 72nd Ave #2082. Call (305) 790-4850 or send the estimate form to set up a visit.
Village standards for single-family driveways: up to three driveway approaches on any single street frontage; the total width of all approaches on one frontage cannot exceed 32 feet; any single driveway is 24 feet maximum and 10 feet minimum; and the driveway must be set back at least 3 feet from the neighbor's property line at all points. One of the three may go on the secondary street, limited to 12 feet wide.
Palmetto Bay ties driveway width to drainage. If the configuration reduces the pervious swale area below 58 percent, the village may require either new stormwater drainage infrastructure or a study from a licensed engineer confirming the design is adequate. On a wide circular drive or a second approach, this is the rule that decides the design.
Multi-family and other residential buildings follow a different standard in the same village: 12 feet minimum and 20 feet maximum width, a 5-foot setback from any adjoining property line, and a maximum of one two-way access or two one-way access ways for every 100 linear feet of street frontage.
The village's corporate boundaries are Biscayne Bay and the City of Coral Gables on the east, SW 136 Street and Coral Gables on the north, SW 184 Street on the south, and the centerline of U.S. 1 on the west. Because Coral Gables wraps the village on the east and the north, two houses on the same stretch near Old Cutler Road can answer to different building departments, so confirm which city issues the permit before applying.
Code compliance lists public right-of-way (swale) maintenance among the village's standing regulations, and names parking on unapproved surfaces among the most common residential violations. Paving more of the yard to park on is the violation the village sees most often around driveways.
The village keeps a public tree inventory map through its GIS gallery, so trees near the approach are on record before the first inspection.
Recent work

Interlocking pavers in gray, charcoal, tan or red blends. Easy to repair one piece at a time.

Broom, exposed aggregate or smooth concrete, straight or curved, or slabs split by grass joints.

Large concrete slabs split by grass or turf joints, for a clean modern look.

Concrete pressed with a pattern and color, for the look of stone at a concrete budget.

Natural stone that stays cooler underfoot and suits Mediterranean homes.
They were punctual, respectful of our property, and left everything clean when the job was finished.
As an OwnersRep/luxury homebuilder in Miami, Ive seen many different driveway installations. MiamiCrete stands out as one of the best combinations in price, service, design, detail, execution, etc.
Yes. The Village of Palmetto Bay issues its own building permits, and the village cites Section 105.1 of the Florida Building Code as the rule that requires one before the work starts.
For a single-family home, any one driveway is 24 feet maximum and 10 feet minimum, and all the approaches on one street frontage together cannot exceed 32 feet.
Up to three driveway approaches on a single street frontage. One of the three may be placed on the secondary street, and that one cannot exceed 12 feet wide.
At least 3 feet at all points for a single-family home. Multi-family and other residential buildings have a 5-foot setback instead.
If the configuration reduces the pervious swale area below 58 percent, the village may require new stormwater drainage infrastructure or a study from a licensed engineer confirming the design is adequate.
Driveways are eligible for Walkthrough Wednesday, the village's same-day service on the last Wednesday of each month from 7:30 to 9:00 a.m. Every required document has to be complete and the contractor's village registration has to be current.
A 2025 village ordinance reduced building permit fees by 15 percent on certain home improvement projects for homesteaded properties, and driveways are on that list. Call the Building and Permitting Department at 305-259-1250 for the amount on your project.